Tag Archives: salon ceiling

Looking a bit more ship-shape…

I know. Technically, she doesn’t look much different than she has for far too long,  at least from this angle.  But inside is a different story altogether as things all come together.

WE HAVE RIBS!

And here’s where the new overhead joins with the original section.

Two layers of double-width ‘ribs’ are laminated over an original rib and a new single rib to give maximum strength. The screws in the photos are temporary clamps; we’ll remove them and fill the holes with thickened epoxy, and the bolts hanging down are attached to 2×4″ ‘guides’ on the bridge to keep everything aligned as the epoxy set. Next: hardware out and layers of glass cloth go up, then it’s topsides to glass from above.

And finally, the aftermath of the weekend. This is our cockpit work area by day’s end. I usually just let everything in the Mix-n-Measure pots harden, then pop the set epoxy out, resulting in a clean, reusable container and a levitating chip brush.

At last…

Last week was a rough one that blindsided me, and home feels a lot emptier for it, but I’ve been dealing by lavishing attention onto the other four-footed residents and by keeping busy.  And keeping busy at this time of year means boat work, in this case in the form of the salon ceiling/bridge deck, which is at long last securely in place.

When last I left off, we’d been prepping out the areas where the edges would join. This included the forward edge of the remaining deck, the salon bulkheads and underside of the bridge.

Think of it like a layer cake – one where the upper and lower layers are fixed in place, and the inner layer (the new laminate core) would be *very* carefully slide in between. Only this layer measures approximately 8’ x 8’, weighs I can only imagine how much, has a camber to match the original curves and exact dimensions of the opening with only millimeters to spare and would be eased in by two people, (one of which is only 5’2”.) Add into this equation that every edge, inner and outer, upper  and lower, needed to be prepped in epoxy, and upon alignment, lagged into place before that epoxy set.  In other words, there was zero margin for error.

Below: The space we need to slip the core through. (Small scrap piece of correct thickness in place to test clearance.)

Below:  The Gazebo with the core on top — this made things much easier.

The key to pulling this off was tons of preparation and planning, repeated ‘dry-fit’ test runs, and everything coming together just right. We had everything in place. Resins, mixing pots and spreaders, fiberglass, brushes, hardware, tools, clamps, stands to support the wood, braces for alignment, etc. With the frame we’d used to originally laminate the wood set up on legs and looking like a gazebo in the cockpit, it supported the core at the right height and allowed us to slide it smoothly into the cabin.

Below: the view from the cockpit. This extends slightly further than the original bridge, which will provide more space above and more protection to the cockpit door below.

Once inside, we angled it down, braced it, wet out all areas that would meet with West System epoxy. We eased strips of pre-cut chop strand mat up from beneath where they would extend down, and smoothed the upper halves of these strips onto the top edges of the core.

Next,  we quickly spread West, thickened to a peanut butter consistency with 406 filler, along the salon bulkheads and bridge underside. At this point I wasn’t taking pictures, as we were racing to cover large areas and get everything in place before the epoxy began to cure. That, and were I to pick up my camera it would likely still be covered in resin. Once everything was wetted out the core was raised into final position and screws went in to set it into position, joining it to the leading edge with clamps, the bridge, and temporary 2’x4’s shimmed and angled to match the final alignment.

And there you have it. Next round, screws out and we’ll be laminating ribs in. After that, we’ll re-glass the underside, then go above, fill all the screw holes with epoxy, and glass the bridge deck.

Bonding with the boat…

Technically, not just with, but actually bonding the boat.  When she was first constructed, the bridge was set down after the salon was completed. Seems logical and makes sense.  However, once we’d removed the saturated salon overhead/bridge deck coring, all that held those regions together was a small bit of filler, much of which had separated.  Needless to say, once water found its way in, it was easy to see why this was yet another source of leaks over the years.

Both areas are quite solid and strong, but there is little holding them together. Here’s a closer look at particularly bad spot.

 

Being that this particular joint is the same location where the new core will rejoin the cabin, some reinforcement were in order. We prepped the area, and yesterday I first wet it out with some West System, then filled and faired all gaps and voids. I’d cut strips of fiberglass mat and laid them over these areas, creating a smooth bond between the salon and bridge.  Today, a bit of wet-sanding before the epoxy fully cures, and I’m going to mold in a small ledge in either forward corner to give the new core that much more to bond against when it goes in.

This small but critical step may not look like much, in fact once the glass was wetted out it’s almost impossible to see, but this represents a key turning point. This round of destruction has rounded the bend. Things are now going back together. This coming weekend, with some willing volunteers on hand to assist, the cabin should once again be solid and bonded on all corners. It will take a few more weeks before everything is structurally reinforced and glassed into place, but we’re getting there.

And once that’s done, THEN we can focus on removing and resealing the salon windows as well as (first) replacing all the damaged wood covering the salon interior bulkheads. Fortunately that is a 1/8″ laminate, so that shouldn’t hit the budget too hard, and with that done, she’ll start to look the way she should… on the inside, at least!

The weather’s looking great for the weekend, so the plans are to pack a cooler with some nice steaks, and once the main work is done we’ll be firing up one of the grills the boatyard has by the river’s edge. It’ll definitely be a celebration, and one thing that makes boat work that much nicer is a bit of fine dining. Hmmm. Maybe I should pack a laundry bag… but I wouldn’t want to scare anyone.

Progress???

Sometimes it seems that going forward requires several steps backwards, and that’s where we stand at the moment. After a long winter’s break, assured that the temperatures had now warmed enough to proceed with epoxy resin, (and equally as assured that the weather would immediately go to hell the minute we began,) we set forth to tackle the salon overhead. But a fresh perspective made us realize this might be more effectively accomplished if we could tilt the new overhead core down inside the salon, prep the areas where it would rejoin the salon bulkheads/base of the bridge, then raise it in place. If this doesn’t explain what we have in mind, don’t worry. All will be revealed in the coming weeks. But it suffices to say that there was one obstacle to this plan: the inner frames of the salon windows. The VERY leaky salon windows, the same windows I’ve been vowing to remove and re-bed before the boat leaves the shed, so…you guessed it. We were going to do it anyhow, so why not now?

I’ll tell you, that’s easier said than done.  These windows are set in teak frames, both inside the cabin and out, and even if the previous owner didn’t have a fixation with excessive though ineffective amounts of exceedingly tenacious caulk, these frames required first excavating the fasteners from beneath teak plugs and *very carefully* separating the teak frame from the boat by delicately hammering heated putty knives into the hardened black goo, (5200?) That then revealed yet more screws, also buried beneath copious amounts of caulking, and these screws secured the inner frames from the outside. From there it’s another round of putty knife/heatgun/hammer to remove the inner side. This stretched over two cold, damp, rainy days while we worked by the glow of droplights and the electric heater.

Below: First round of screws removed, commence prying.

Well, there’s your problem. (Below) Globs of caulking, silicone and bubblegum won’t keep the water out if not evenly applied. A single, narrow, clean bead of sealant would have been far more effective, not to mention kept me from cursing the misguided soul that made this mess to begin with.

No. More does NOT equal better if large areas are not evenly distributed.

The logic behind this baffles me.

Oh are my arms going to look good by the time this project is done.

Below, keeping the putty knives 2nd degree burn hot. It made caulking removal only a little less unbearable.

The galley. Isn’t it pretty?

Stay tuned. More fun (insanity) to follow!

Watching the thermometer…

One of the oddest but most vital tools we keep aboard Annabel Lee is a cheap little thermometer masking-taped up to the salon window. It’s nothing fancy, but presently, that little device and the readings it provides determine all else that occurs on and around the boat. And while we’ve had some unusually warm weather over the last few weeks, it hasn’t been consistent enough to risk mixing epoxy just yet, so we’re waiting a bit longer before launching into the next phase of boat work. However, from past experience I’ve come to be wary of the weather when it comes to any project that involves epoxy — in fact that was the subject of my  3/29/12 post at Write On The Water: Murphy was a Meteorologist

Meanwhile, Evacuation Route is taking shape quite nicely, and I’ve located some excellent contacts to guide me along with some fascinating and twisted research that plays into the plot, and brings me back to my 3/22/12 W.o.t.W. post regarding the inspirational mayhem the marine environment offers:  Thanks for the inspiration, but…

With minimal explanation I bring you…

…some of what we’ve been up to lately. These 2x4s will serve as guides to set the ceiling core to the correct height as we work from below.


They’re bolted to the ceiling up forward, and the layer of plywood duplicates the thickness of the fiberglass that will ultimately cover the core, set to match the original glass.

 

And here’s the core, down at ground level, measured and ready to be cut to proper size.

Once trimmed, we had the yard lift the core on it’s template frame up to supports in the cockpit, set to the proper height, so the entire core can be eased forward into place and dry-fitted, then epoxied and glassed into place.

And there we are, all lined up but out of weekend.



Holes…

I often refer to Annabel Lee as a collection of leaks in the shape of a boat, and a boat, by definition, is a hole in the water into which you throw money. So cutting large holes into that already leaky hole might be viewed as a questionable action, but that’s what we’ve gone and done.

We now have a well-ventilated salon to match our well-ventilated engine room.

This should make passing sodas up to the bridge easier.

I have emails to return, mountains of writing ahead, and a cabin full of itchiness.  This is just the start, but as which so much else in my life at the moment, there’s no turning back now.

Right now, I’m turning in. Much to do tomorrow. Too tired to think tonight.

Update: In case you’re wondering how we’ll close this big hole, that’s why we built this…