Here we go again…

This in no way relates to the other ‘big’ announcement I will be posting in the coming days, but we’re preparing for the next big phase of leak elimination, this one from above.

Shown below is the frame built to duplicate the actual dimensions and shape of the area we well be replacing, with 3 layers of marine plywood clamped down to ‘shape’ them into the proper curve. The ply will be laminated together with epoxy resin, supported by stringers that duplicate the originals and glassed in from above and below. This laminate will be transported to the boat by laying it, frame and all, across the truck’s bed and driving it down to the boatyard, where it will be lifted by the Wiggins forklift to the proper height and guided into place. Should be interesting.

Then the frame will serve as the template to make a foam-cored hardtop for the bridge itself. And finally the frame will be ‘roofed’, given walls and a concrete foundation and serve as a uniquely shaped utility shed behind the house.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s