Bonding with the boat…

Technically, not just with, but actually bonding the boat.  When she was first constructed, the bridge was set down after the salon was completed. Seems logical and makes sense.  However, once we’d removed the saturated salon overhead/bridge deck coring, all that held those regions together was a small bit of filler, much of which had separated.  Needless to say, once water found its way in, it was easy to see why this was yet another source of leaks over the years.

Both areas are quite solid and strong, but there is little holding them together. Here’s a closer look at particularly bad spot.

 

Being that this particular joint is the same location where the new core will rejoin the cabin, some reinforcement were in order. We prepped the area, and yesterday I first wet it out with some West System, then filled and faired all gaps and voids. I’d cut strips of fiberglass mat and laid them over these areas, creating a smooth bond between the salon and bridge.  Today, a bit of wet-sanding before the epoxy fully cures, and I’m going to mold in a small ledge in either forward corner to give the new core that much more to bond against when it goes in.

This small but critical step may not look like much, in fact once the glass was wetted out it’s almost impossible to see, but this represents a key turning point. This round of destruction has rounded the bend. Things are now going back together. This coming weekend, with some willing volunteers on hand to assist, the cabin should once again be solid and bonded on all corners. It will take a few more weeks before everything is structurally reinforced and glassed into place, but we’re getting there.

And once that’s done, THEN we can focus on removing and resealing the salon windows as well as (first) replacing all the damaged wood covering the salon interior bulkheads. Fortunately that is a 1/8″ laminate, so that shouldn’t hit the budget too hard, and with that done, she’ll start to look the way she should… on the inside, at least!

The weather’s looking great for the weekend, so the plans are to pack a cooler with some nice steaks, and once the main work is done we’ll be firing up one of the grills the boatyard has by the river’s edge. It’ll definitely be a celebration, and one thing that makes boat work that much nicer is a bit of fine dining. Hmmm. Maybe I should pack a laundry bag… but I wouldn’t want to scare anyone.

Advertisements

2 responses to “Bonding with the boat…

  1. Reblogged this on Ployers Blog and commented:
    Very impressive restoration of this 1977 Cheoy Lee. Thankfully my 1973 Trojan does not need this extensive of a restoration. Great read through the entire few years of the extensive reno. Awesome job C.E.!!!!

  2. Pingback: When is rape ‘OK’? | c.e.grundler

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s